Progress this month
- Knauf Glasswool 03/03/08
- Marshalls Priora Paving is laid- 05/03/08
- The NBT Claytec walls are constructed- 06/03/08
- Gabion Walls - 11/03/08
- Work continues on courtyard roof - 12/03/08
- Passivent Airstract Terminals - 13/03/08
- Solar Cylinders - 17/03/08
- Insulation cutaways - 19/03/08
- Filling of the Gabion Cages - 20/03/08
- Glulam Beams - 25/03/08
- Photovoltaics - 27/03/08
- 31st March - 31/03/08
Photovoltaics - 27th of March, 2008





- Click to enlarge
- Full photo gallery »
The Solar Century Photovoltaics that are inset into panels of glazing are fitted into the street roof. Photovoltaics produce electricity from the solar radiation and this electricity is then used throughout the building. There will be further photovoltaics fitted on the louvers on the south side of the building and the frame work has been installed to support the panels.
The basins and the Saracen infra red taps are installed into the toilets and the CFL’s from coopers.