Progress this month
- Rockwool Flexi Insulation and the delivery of the Priora Paving - 02/10/07
- Laying the Marshalls Priora Paving - 04/10/07
- Timber Frame - 11/10/07
- The Arrival of Hanson Cobiax - 12/10/07
- The Hanson Cobiax Floor - 12/10/07
- Fitting the Finnforest I Beams - 15/10/07
- The completion of the Roof Joists - 19/10/07
- Steel Enforcement for the Cobiax Slab - 22/10/07
- The Pouring of the Concrete - 24/10/07
- The Completion of the Cobiax Slab - 24/10/07
- Development of the North Side - 30/10/07
Laying the Marshalls Priora Paving - 04/10/07





- Click to enlarge
- Full photo gallery »
The hard surfaces on site including the access road feature Marshalls Priora paving. Priora is Marshalls’ permeable paving solution for use in Sustainable Drainage Systems (SUDS) and schemes. Priora is an innovative paving system which, coupled with a specific design methodology and sub-base specification allows surface water to be controlled at source. Water can be drained directly into the ground, recharging the ground water whilst also controlling the surface water runoff at source. Priora blocks are produced in a 200 x 100mm rectangular module 180mm deep with a patented interlocking joint.