[« Previous] [Next »]
Progress this month
- Rockwool Flexi Insulation and the delivery of the Priora Paving - 02/10/07
- Laying the Marshalls Priora Paving - 04/10/07
- Timber Frame - 11/10/07
- The Arrival of Hanson Cobiax - 12/10/07
- The Hanson Cobiax Floor - 12/10/07
- Fitting the Finnforest I Beams - 15/10/07
- The completion of the Roof Joists - 19/10/07
- Steel Enforcement for the Cobiax Slab - 22/10/07
- The Pouring of the Concrete - 24/10/07
- The Completion of the Cobiax Slab - 24/10/07
- Development of the North Side - 30/10/07
Steel Enforcement for the Cobiax Slab - 24/10/07





- Click to enlarge
- Full photo gallery »
The Cobiax slab is reinforced with a steel mesh which is laid over the top of the plastic spheres before the concrete is poured. This use of the steel in a preformed sheet which could then be rolled out on top of the slab had never been used before and proved to be time saving and easy to fit. The steel gives the Cobiax slab further strength so that it can span wide spans with little support.